HomeMy WebLinkAboutAgenda Statement 1975/12/16 Item 1313 CITY OF CHULA VISTA ITEM N0. • - COUNCIL AGENDA STATEMENT ~~ 12/16/75 FOR MEETING OF: ITEM TITLE: RESOLUTION #7976 : Authorizing Change Order #30 to th Construction Contract for the Chula Vista Library SUBMITTED BYE Director of Public Works, City Engineer ~~) U- ITEM EXPLANATION The Director of Building/Housing and the Library Project Coordinator support the architect`s recommendation that Change Order #30 to the Chula Vista Library Construction Contract be approved. This change order involves the installation of condensate drains for six air-conditioning units located on the roof o the library. The drains are an absolute necessity which we e not included in the library plans due to an oversight by th architect's mechanical engineer. Since the mechanical engineer is at fault for not including the drains, he has agreed to pay the difference in the cost of n- stallation now and what it would have been prior to the lib ary construction. This amounts to about 20% of the $2,644 cost for labor and materials, or $533. An invoice has been sent to the mechanical engineer in this amount. The following change orders have been approved thus far: continued on Supplemental Page EXHIBITS ATTACHED Agreement Resolution x Ordinance Plot Environmental Document: Attached Submitted on STAFF RECOMMENDATION: Approve Change Order No. 30. BOARD/ COMMISSION RECOMMENDATION: COUNCIL ACTION APPROVED b3- the City Council of Chula Vista. California Two Form A-113 (Rev 5-75) C.O. # Purpose Supplemental Amount Item Page A~~r 13 Two ved b 1 Deletion of storm drain cleanouts $(1,010 Res.! 7861 2 Tree removal -0- D W 3 Removal & replacement of unsuitable soil 989 D ~ W 4 Additional demolition 2,713 Res.~ 7861 5 Conduit change (800) D W 6 Upgrade door frames 185 D W 7 Additional sound board 408 D W 8 Reroute waste lines 479 D W 9 Relocate 3" cold water pipe 382 D W 10 Eliminate fire proofing (2,050) Res.' 7919 11 Revise clocks -0- D W 12 Revise floor finish schedule 460 D W 13 Enlarge & fence-in utility pad 5,870 Res. 7935 14 Sliding doors modification 328 D ~ W 15 Change interior walls from gypsum plaster to gypsum drywall (1,125) Res. 7935 b 16 Strainer in chilled water header 850 D W 17 Colonnade plaster 5,267 Res.~ 7943 18 Tile anchors 557 D W 19 Delete "T" type fixtures (567) D W 20 Door latch sets 64 D pW 21 Extension services-room,ceiling,lighting 2,692 Res.' 7965 22 Steel angles for metal studs 885 D W 23 Steel plates for roof 980 D W 24 Steel roof hips 854 D W 25 Steel angles for roof deck 972 D W 26 Floor sink for condensate 806 D W 27 Additional electrical service 1,678 Res.j 7965 28 Drywall for basement stairs 265 D W 29 Backflow prevention box 551 D W 31 Delete concrete encasement for conduit (300) D W $22,378 Financial Statement: ~ Appropri ated in account #63-7003-5569 $1,886,470 Original contract cost $1,758,300 Prior ch ange orders 22,378 Proposed Change Order #30 2,664 i 1,783,342 ~~~~