Loading...
HomeMy WebLinkAboutAgenda Statement 1975/12/16 Item 05a,bCITY OF CHULA VISTA ITE~VI NO.~ 5 a, b COUNCIL AGENDA STATEMENT ~ ~ 12 16 75 FOR MEETING OF:-L-L_ ITEM TITLE: Public hearing - Consideration of Precise Plan for Bonita Vista apartments, medical offices and retail center in 700 block of Otay Lakes~Road Resolution - Approving Precise Plan for Bonita Vista apartments, edical ~ offices and retail center in the 700 block of Otay Lakes Roa SUBMITTED BY~~~'~f Director of Planning ITEM EXPLANATION 1. On November 24, 1975 the Planning Commission adopted EIR-75-5, approved a conditional use permit for 90 apartment units in the C-C-P zone, and voted to recommend a proval of the Precise Plan PCZ-74-H for development of 10 acres± of property in the 700 block of Otay Lakes Road. This item presents the Precise Plan to Council. 2. This property, known as the "Norman/Ashwill site," has been under study f r about 18 months. The. last action taken by Council was to rezone the site to C~G-~P (7.5 acres) and C-O-P (2 acres) in October, 1974. Subsequently, the owners have contract d with McMillin Construction Company to develop the property. 3. The project which is being presented herein consists of the following lan uses (please refer to Exhibit "A"). a. 90 apartment units on 6± acres, south of the new collector street. b. Medical office building, 20,150 sq. ft. on 2 acres, north of the new c llector street. c. Retail commercial, 15,000 sq. ft. on 1.5 acres, fronting on Otay Lakes Road. The Planning Commission found that the project fulfills the Precise Plan Modi ying District and conforms to the various elements of the Chula Vista General Plan. The co plete analysis and findings are contained in the attached staff report of November 24, 1975. The Planning Commission recommended approval subject to several conditions, one of which included architectural approval of the apartments by Planning Commission and City Council. The architectural elevations of the apartments have not been resolved with th applicant. (cEXHIBITS ATu~ACHED al page) Agreement Resolution X Ordinance Plat Cher Rpt. to P. EIR-75-5 11/24/75 & Exp. Environmental Document: Attached Submitted on Dec. 5, 1975 es. PCM-75-27 STAFF RECOMMENDATION: Concur with the Planning Commission recommendation except for the requi~ architectural changes noted in paragraph 4 of this report. nt of BOARD/ COMMISSION RECOMMENDATION A. Planning Commission voted 6-0 on Nov. 24, 1975 recommending that the City Council approve Precise Plan for B~ni,~aPV~~ yn ~cgordance with resolution CM-75-27. B. Safety Commission will con er P 5-27 on Dec. 10, 1975 and forward their recommendation to the City Counc~Y ~I~r separate cover. COUNCIL ACTION CiVy C~-~~~~ct1 o_, A, Chula ti i~~cw, G~~_lilo~°nia ~, ~ 7.5-. ., r ...........................,,........ ............... dated ~ ' ~ ` Form A-113 (Rev 5-75) AGENDA ITEM N0.' Sa,'b Supplemental Page No. 2 It is staff's conclusion that the matter of architectural treatment should beiresolved in terms of Council direction to the applicant at this time. If such direction is not given, the staff and the applicant would be uncertain of the treatment require and this could lead to problems at the building permit review stage. 4. Architecture. The architectural treatment of the apartment units is shown on sheets A-4 and -5 of Exhibit A. The buildings would be constructed as two story, flat roofed struc ures, with predominantly stucco and rough textured masonite. Balconies and stairrai s consist of a mixture of wrought iron and wood. In certain areas the stairs would be a gled to the face of the building making them an unduly prominent feature of the design. Other thin some of the stair arrangements, these elevations are the same as those used on the new Oxford Arms apartments located near the northeast corner of Fourth venue and Oxford Street (County). Council may wish to view those apartments to gain an understanding of the architectural treatment proposed on the Norman/Ashwi1l si e. While the architectural treatment of the recreational building (sheet A-4), fe turfing a pitched roof with varying angles and projections, creates a feeling of warmt and interest, the remainder of the project which houses the 90 units does not. Th two-story flat roof design, sprinkled with rough textured masonite, is in stark contrast to the recreation building. The use of material to accent the vertical features, cou led with the rectangular shape of the buildings, does little to enhance the architectur of this area. Since the project represents the first apartments to be built in this s ction of the city, it is important to maintain an architectural quality at least equal o the construction which has preceded the apartment development. That quality of de ign can be seen in the housing developments in the immediate area. Staff believed tha the pro- posed architectural treatment is out of character with the residential uses ne rby and that the architectural treatment of the proposed apartments needs considerable modifica- tion. There are three features which staff recommended be incorporated into tie eleva- tions. None of the features would affect the internal floor plans: a. The use of a pitched, wood shingle (or other textured material) roof. b. More effective use of wood trim, such as around the window areas, and m~re continuity in the use of accent paneling. c. Provision of a more subdued stairway and balcony screening treatment. >Chese elements should not be allowed to dominate the buildings. The Planning Commission, by a 3-3 vote, changed the above three modification p oposals to require "reasonable architectural control" prior to the issuance of building p rmits. (See condition No. 3 in the attached Planning Commission resolution.) ~J Q~ • ~ ~ ~~, ~~ i~ City Planning Commission Ayenda Items for Meeting of Plovember 24, 1975 page 15 8. PUQLIC NEARING: Consideration of Precise Plan PCZ-74-H f_or Bonita Vista apartments, medical and retail center - Norman/Asht~ill A. [3ACKGROUND 1. The preceding agenda items considered EIR-75-5 for this Precise f~1an and conditional use permit PCC-75-15(b) to construct 90 apartment units in the C-C-P zone. This item completes the proposal by expanding the plan to the full, 10± acres and by considering approval of tine apartments, medical office center and retail commercial center as one interrelated Precise Plan. 2. The 10 acre site eras rezoned to C-O-P (2 acres)and C-C-P (7.5 acr s) on October 29, 1974. Criteria required for development of the property incl ded specified setbacks; R-3-G density control; sign criteria; access requirem nts; architectural coordination between structures on the property and the adj ir.ing 8 acre commercial site to the south; and the requirement for a Precise Pl n on the adjacent 7.5 acre property in the C-C-P zone. 3. The developer is submitting a Precise Plan on all 10 acres. It i~ his intent to develop the apartments first, medical building next, and lastly, the retail co,~,~ncrc~ial area at some time in the future. Other than access, pa king and building footprints, the last phase retail commercial area is shown only 'n schematics. (Please refer to Exhibit A in the preceding agenda item for ail map references.) 4. EIR-75-5 ti~~as certified under the preceding agenda item. No furthE action is necessary. C. DISCUSSION 1. The environmental setting and site characteristics are discussed in the preceding report and will not be repeated here. 2. Precise Plan Proposal a. Exhibit A, Title Sheet, gives the project data. The developer to construct a t~•ro story, 20,150 sq. ft. medical office building on the nc side of "A" Street. The plans call for 19 doctors' offices, a pharmacy ar supporting laboratory spaces. The medical office complex occupies ~~bout ~ 'r plans °th acres. b. The 1.5 acre retail commercial area is located between the apartments and Otay Lakes (toad. The skeletal precise plan proi~~oses about 15,000 sq. ft. of commercial floor space. This includes a fast food restaurant at the north end, a car wasi~ at the south end, and approximately 12,600 sq. ft. of enclosed retail City Planning Commission , Agenda Items f,or t~e~ting of November 24, 1975 •page 16 stores in betr~een. c. The 6 acre apartment complex has been previously discussed i~r the preceding item, PCC-75-15(b). ~, 3. Precise Plan Analysis Staff has evaluated the precise plan and elevations, and with the ex'eption of the apartment architecture, finds the Precise Plan to fulfill the requirements of the zoning ordinance and the conditions of approval of the "P" zoning!(PCZ-74-H), as follows: a. R-3 density shall be limited to Z7.4 DU/Acre. The Precise Plan shows a density of 14.9 DU/Acre. b. Building setbacks shall be 30' from Otay Lakes Road and 25' ,From "A" Street. The building locations shown on the Precise Plan conform to the rhequirements. i c. Freestanding signs shall be ground monument onZry. Other sigrks shall eonforrn to t'rte zoning ordinance. Although signs have not yet been submitted, the applicant is aware of the conditions. In addition, sign criteria are set forth in Section E of this report for Planning Commission consideration. d. Design features of this project uriZ2 be coordinated roith the ,B acre center to the south. Inasmuch as the 8 acre project has not yet developed, this condi~ion is not attainable at this time. In any case, staff would consider 'first in" as setting the design themes to be followed by the second development. e. Grading of the 7.5 acre C-C F propertzy shall conform to the G}pen Space Element of the General Plan and the Hillside Development PoZi.cy. Preliminary analysis of the grading plan indicates that the grading is consistent ~•rith the Open Space Element, which shows the southwestlcorner left natural; the Hillside Development Policy, which calls for development on more level ground, leaving steep slopes ungraded. f. A Precise Plan for the entire 7.5 acre proper try shall be submitted . prior to the issuance of permits. , The Precise Plan as submitted shows only a skeletal plan and no elevations for the retail commercial uses. In staff's vier, the Precise Plan shows that the key elements of access, internal circulation, and relationship bett•reen land uses is functional and acceptable. lv'hen the re tai 1 con~nercial area develops, an amendment to the Precise Plan will be required. F I N A L Environmental Impact Report EIR-75-5 BONITA VISTA Prepared for Bonita Glen Developers Inc. Issued by Environmental Review Committee Oct. 16, 1975 j Adopted by The Planning Commission '; Nov. 24, 1975 t TABLE OF CONTENTS page 1.0 Introduction 1 1.1 Purpose. 1 1 .2 Executive Summary. 1 2.0 Project Description. 2 2.1 Location 2 2.2 Residential Uses 2 2.3 Medical -Professional Uses. 2 2.4 Retai 1 Land Uses 2 3.0 Impact Analysis . 2 3.1 Geology. 2 3.2 Soils. 5 3.3 Topography 7 3.4 Drainage Patterns. 9 3.5 Archaeology. 9 3.6 Biology. 13 3.7 Air Quality. 17 3.8 Noise. 21 3.9 Schools . 24 3.10 Parks & Recreati on 24 3.11 Police & Fi re Protection 25 3.12 Transportation/Access. 25 3.13 Uti 1 i ti es/Energy. .. 26 4.0 Unavoidable Adverse Environmental Impacts. 27 5.0 Alternatives 28 5.1 No Project 28 ~~age 5.2 Lower Density Residential Development. 28 5.3 Larger Commercial Development. 28 6.0 Relationship between Local Short-Term Use of the Environmenta and the Maintenance and Enhancement of Long-Term Productivity. 29 i 7.0 Irreversable Environmental Changes that will '; result from the Proposed Project. 29 8.0 Growth Inducing Impacts . .. .. 29 9.0 Organizations and Persons Consulted 30 10.0 Input i .. i 31 r APPENDICES A Soils Report (On File in B Archaeological Resources Impact Report the Planning Departments) C Biological Survey D Letters to School Districts E Letter regarding Low Income Housing FIGURES a e 1. Locator 3 2. Aerial Photo. 4 3. Topographi c Map 8 4. Drainage Map 10 TABLES i A Archaeological Finds 11 B Chula Vista Oxidant Trend 18 C Regional 68-75 Trend 19 D Mobile Source Air Pollution 20 ,E Stationary Source Air Pollution 22 F Incremental Increase in Air Pollution 23 EXHIBIT 1 Precise P1 an Back F~1 der EIR-15-5 BONITA VISTA 1.0 Introduction 1.1 Pur ose This Environmental Impact Report (EIR) has been prepared to fulfill the requirements of the California Environmental Quality Act of 1970 (CEQA). It is intended to disclose all significant environmental impacts of the pro osed project to the decision making authority of the City of Chula Vista and the public, and to consider alternatives to the project as it is proposed. This EIR is a result of an Initial Study (IS-75-57) conducted by the Environ- mental Review Committee of the City of Chula Vista. It was the conclusi n of that Initial Study that the project could have possible significant impa is on the environment and therefore an EIR was required to evaluate potential impacts. 1.2 Executive Summary The project consists of a 10 acre development including 90 apartment unfits, 20,000 sq. ft. medical office building and approximately 16,000 sq. ft.~of retail commercial uses. The project also includes the extension of a s reet from Otay Lakes Rd. to the north-western corner of the property. The project site contains expansive soils that can be adequately treater during grading of the site. There is a potentially significant archaeological site that could be destroyed during this grading operation. The applicant has ag eed to have a qualified archaeologist present during grading of the site to in ure no important non-renewable resources are destroyed. The project will not have any directly significant biological impact on the environment. In a long-rajnge sense, though, the project constitutes one more incursion into the Rice Canyon .area. The ultimate loss of vegetation and wildlife throughout this area is significant biologically. The commercial area of the project will be subject to clearly unacceptable noise levels from Otay Lakes Rd. traffic as volume increases in the future. Secondary school facilities are over capacity in this area and students generated by this project will cause an exacerbation of the problem. ', The implementation of the project will have an impact on the environment. The effects of which can be mitigated and therefore regarded as insignifica t. However, what cannot be considered insignificant are the future cumulat ve impacts of development of the entire Rice Canyon area. Development of ice Canyon will be biologically significant due to the ultimate loss of veg tation and wildlife. The normally unacceptable noise levels for the residential area do not consider barrier attenuation adjustments and mitigating construction techniques can be utilized to adequately protect these residences from acoustical impact. 2.0 Project Description 2.1 Location The project is located on the west side of Otay Lakes Rd. 800' north of fast "H" Street and south of the SDG&E power line easement. (See Fig. 1 & 2)! 2.2 Residential Uses 90 apartment units are proposed for 5.9 acres at the south-western porti~n of the project site. 20 of the units would be one bedroom while 66 units w old have two bedrooms and 4 units would be three bedroom. All of the units ould be located in 9 two story structures. Recreational facilities include a reading and card room, activity center, Jacuzzi and swimming pool, about 53% of the site would be landscaped or left in a natural state, while 17% would be covered with structures and 30% would be paved. The net density of the project will ~e about 15.8 dwelling units per acre. Access to the project will be via a new collector road on the northern s de of this residential element of the plan. This collector road will exten from Otay Lakes Rd. to the western boundry of the project site. 153 resident and guest parking spaces are provided. The project will have an estimated p pulation of 180 people and will have rental price range of $175-$265. (See Exhib~t 1 "Precise Plan") 2.3 Medical - Professional Uses A medical-professional building is proposed for the northern portion of ~he property. It will be a two story 19,880 sq. ft. structure with about 10 parking spaces. The building will cover about 11% of the site with 64% laved for parking and circulation and the remaining 25% in landscaping. ~ The facility will employ about 19 doctors with 29 other staff and professional people. Over 200 patients and customers will be served by the project ech day. 2.4 Retail Land Uses This phase of the project is not well defined at this time. No precise ~lan has been prepared but it will be submitted at a later date. Additiona environmental review will be required at that time. i Because of the commitment to the proposed retail use by the grading and Division of the property, an analysis is presented herein but at a lower level of~ specificity than the other elements of the project. If the site is developed with typical retail uses about 16,000 sq. ft. o floor area will be provided along with about 80 parking spaces and an appropri to amount of landscaping. Other details of the plan are not available at t is time. 3.0 Impact Analysis 3.1 Geology 3.1.1 Geological Setting A soil investigation and geologic reconnaissance of the project site has 2 ., , ~ 1 "` / ~ ~" / ~ ,; ~ / i ~ ~~e `/ 4, ~~~~t t~ ' 19 -_ . ,~. , ..~ ~ , ~ ~ ~ ~' i ,, ~ ~'~~ ~ " ~ t / / -.` .~ ~ 1 ~ , 1 ~i ' ~ 1 1 1 1 ~ BONITA VISTA , ~ Of 1 ~ ~ COVNTV ~ 1 ~L ~~~~~~~~~~~~~~~~ J / ~ v!•a W~~~~~~~ ~ I , ~ ~ ~ SAN DIEGO ~' ~ LO CAT t O N =`___ j /'' 80NITA VISTA / , ~ /'~+< ~ E'SE~ ~!' O t~ +°°~ 0 ~ ~~ i ~~ t i .. !I: ~ ~ -' !A u - '1~"' ,., r. ;. ',•.=`~ ,. •~,' r, ~' 7. / r _ -~~;,~~ ~~ ~ ~ r`~-- (TTT'TI ~ ,~ ~ ~, ~ . ~ ' ~ ~~ Jr i. ~i ~'~ ,+ ELE Y[MTA11Y iCNOOI. 117E s~ '1~ll"'" V~~v O ~<~ Doo 00 1`" ~ ~p ~y J ~ 0 DO 0 00 oOOc O ~ f _._---- 3 ,i ~ j i z STREET ,~ -~ -~ ,-~ ~" ,~ - ~ A T q ~#L ..x~ 7 ~. 7~ ~. try ~~, ~ 1 ~ q ~ ~ Y i1p~~ 7 '! R - ~' ~' ~ ~ ±~'r'- ~ P _ ff'`,~L,~s .r fit.+.r~ _- Y 1~ _ _ - ~1 - ti tis.. "~ r _k~s + Y ~ ,,~ ate' a ~~ '_y~+` ~ } ~~~t .. ,. ~, ~~ '.L(`'~7vyy~~y~ ~ j~ ~ t 7 `t 1FS'~4 1~7f' 4 • ` x ~"~~~ ti4'~..y~y,S -'*: ~`.~y-' An ~ 4k.'-;~ .i1-. ~h %~~ j4r+ . .. ~ :: ~,,, ~ „ ~-, ti ~ '~.' f'x r .. ~ -. a+ - ~. _ {: f~ F- .~j~ . ~ 7,~ ~, ,~ ta'r" r Y ~ ~ ~-' '''~r ~ # r ~ - . r~7 ~ `, k4 x -. ,. .. ~ ' ~'w Y T ' :. Y ~~ ~- ~ '~, - ~ ~ ~ '~ ~` ~ ~ - ~ -. r._ i.!'. .3, ~ . ,~. .. ~ ~ ,~ _ ~ ~ ~ ~' `~ C F` ' J ~ ~y'-,~,~ ~ Shy rl. - M ~ ' ,~ f ~~;~ ~ - .. . . ,~ - ,~ ., s" L ~~ Y 4 ~ , ~ ' . .~ `~' ~ +. ti, ~ ~ r.: ~ ~ ~_ J `~ ~~ ~ 1 ,,µ ,~; ~ l~ >r;~- 1 •~~ !Fl r^..'~4 ~ y~f ~e`. -Y ~. 1+'47 .'. ~ ~ r~' 4, ~ ~fi y ,_. x. ~ , ,. ., •! ~ _ . < ~,~'' ` ~i~' 4k.- ~ .c .. ~ A ~ ... ,; S $ fi a v ~~ ~' ~- ° x. ' .~ :. ;- ~ rat r~ ~# ~;, ~,~, ~ --'~~ - .. ~~a '~~'; .y r 35-~ a ~~~ ~. ' ~ ~ 1~; > ,.~ 4 ,r" "' ~ n ' ~ ;' ~ been conducted for the project applicant by the firm of William S. Krooskos & Associates. Their report is presented as Appendix A ofithis EIR and the major conclusions are provided in the text of this EIR. The proposed apartment and medical building sites are situated on Pliestocene Marine Terrace (Otay Mesa) which is underlain by Miocene and Pliocene Marine sediments. An inspection of the existing roadcut adjacent to the property on Otay Lakes Road, indicates that the P1'ocene San Diego Formation is interfingered with the Miocene Otay Formation. This is based on lithologic descriptions. All bedrock units observed on the site and surrounding the immediate area are nearly flat lying. The elevation and geographic location of the site precludes any hazard due to flooding or inundation from tsunamis. Since this site is n t located near a lake, reservoir or other body of water within a res ricted basin, the danger due to seiches is non-existent. Liquefaction is not a potential hazard on this site, since the underlying bedrock exists~in a dense state. Faults: No faults were observed on the site nor are there any kno~n faults within the project boundary. The nearest known fault is th north-south trending potentially active La Nacion Fault located ap roximately 1.2 miles west of the site. Because the La Nacion Fault is classified as a potential fault, the risk of damaging ground shaking from a rehatively large event on this fault is considered to be e tremely low during; the lifetime of the proposed structures. The site will be subject to periodic seismic shaking from earthqua es on remote faults, but the seismic risk is not greater for this site tan fen any other average building site in the western portion of San Dieg County that is located on firm ground and not situated on a fault. j Landslides: No landslides or earth slippages were observed on the~site or are known to exist ire the subject area. The nearly flat lying underlying dense, bedrock units are not prone to landsliding. 3.1.2 Potential Imoact There are no geological hazards on or near the project site that c uld result in any possible significant geological hazard that could a fect the project. ' 3.2 Soils '; 3.2.1 Project Setting Scattered across the site are hummocky deposits of end-dumped unco~pacted fill soils with debris. Uncompacted fill soils placed adjacent to Otay Lakes Road were encountered to a depth of 8 feet below the existing ground surface in Boring No. 1. These soils primarily consist of silty sands. These soils are non-expansive; therefore, posses less than three percent swell as measured by the City of Chula Vista Test for Expansive Soils. 5 Blanketing the site and extending to depths ranging from 2 to 5 felt are topsoils consisting of clayey sands, silty sands and residual Sandy clays. The clayey sands and silty sands are non-expansive. The sandy clays posses moderate expansive characteristics with a swell varying frog 4 to 6 percent as measured by the aforementioned test for expansive sous. Underlying the topsoils on the western two-thirds of the site are ~ense, clayey sands and sands with cobbles comprising the quaternary Terr ce. These soils possess excellent bearing characteristics and are non-expansive As indicated in Qoring No. 7, these soils extend to a depth of approximately 15 feet below the top of existing ground. Underlying the topsoils along the eastern interbedded silty sands and clayey sands The silty sands are non-expansive and the expansive characteristics. 3.2.2 Potential Impact An expansive soil is one that changes in of moisture it contains. This change in foundations, paving and utilities. 3.2.3 Mitigation one-third of the site ar~ of the San Diego and OtayFormations. clayey sands possess moderate volume, relative to the a ount volume can destroy structural I i In the proposed building areas where expansive soils will exist wi~hin two feet of finish grade, either one of the following recommendations (a. or b.) shall be adhered to. a. If it is the intention of constructing the proposed buildings with conventional continuous foundations, spread footings ~nd concrete floor slabs without special reinforcement, then i~ is recommended that the following work be performed. 1) In the proposed building areas and extending fiv~ feet beyond the perimeters thereof, it is recommended that the potentially expansive clay soils that occur within twp feet of the finish ground grade be excavated and removed f~om the site or placed and compacted in the deep fill areas. The building areas shall then be backfilled with non- xpansive soils up to the finish ground grade. Non-expansive s ils are those which have a liquid limit of less than 30 perce t, a plasticity index of less than 75 percent and a swell hndex less than three percent when remolded to at least 90 ~ercent of maximum dry density and subjected to a normal load of one pound per square inch. i 2) In these building areas, since a minimum depth o two feet of compacted non-expansive fill soils and compac ed non-expansive natural ground soils occurs below the finish ground grade, conventional type continuous foundations and spread footings, and concrete floor slabs may be utilized 6 for the proposed buildings without special reinforcement or treatment. Foundations and footings of the proposed , structures may be founded a minimum depth of 12 inches into the compacted non-expansive fill or non-expansive naty~ral ground soils. b. If it is the intent to construct the proposed structures on the medium expansive soils, then it is recommended thatithe following work be performed. 1) The continuous foundations and spread footings shall extend a minimum depth of 18 inches into the firm nat~rral ground or compacted fill. The continuous foundationsishall be reinforced with two No. 5 steel bars; one bar located near the top of the foundation and the other bar nearthe bottom. 2) The concrete floor slabs shall be founded on at east six inches of non-expansive soils such as on-si e silty sands, decomposed granite, etc., or equal, and e reinforced with 6x6-10x10 steel wire mesh. 3) It is recommended that such as patios, driveways, at least four inches 3.3 3.2.4 Analysis of Significance all non-structural concre e slabs sidewalks, etc., be founde~ on of non-expansive soils. It was the conclusion of the Soils Engineer that the expansive sandy clay soils and uncompacted fill soils could be adequately prepared and ~reated to insure that the site was suitable for the proposed use. There v~ill therefore be no possible significant impact on the environment. Topography 3.3.1 Project Setting The project is located along a ridge upon which Otay Lakes Rd. descends into the Sweetwater Valley from the Southwestern College area. (S~e Fig. 3) 3.3.2 Potential Impact The grading necessary to implement the project will require; the excavation of approximately 50,800 cu. yrds. (14,800 cu. yrds. fill, 36,000 c .yrds. of export); a maximum cut of the natural topography of up to 15 fe t (average cut 4'); and fill area up to 13' deep (average 3'). The export ma~erial is destined for Bonita Road & I-805. The finished grade will result in some fill slopes adjacent to Otay~ Lakes Rd., but a flatter appearence of the site will result. Some fill slopes on the western boundary and cut slopes on the northern boundary will be created. 3.3.3 Mitigation Slopes will be landscaped and irrigated in accordance with requirements of the Landscaping Ma nual as adapted as Council policy. These requirements will insure that there willbe no significant erosion or aesthetic impact. The impact upon the fill site will be evaluated and mitigated by means of a grading plan. 7 ^ ,, ~ ~ ~~ ~ ~ i ;, ~~ `, l ; ~. ~ V ~;~ ~ ~ ~ i ~ ~ ~ ~ i I ~~ \ \\ `\ 1 ~ ~ 11 ; ~ ~ 1,~ j ~ ~ ~ ~~ - 1 ~ ~, ~ g~2 O \~. ~~ ;\ \ r. ~1'~~ r ~~, i i ~~ ~, ~ ~~ / ~\ %. \~ ~~~i ,. ~ ~~ ; %- 4q ,A ~' ~' 1 4j3 I •S \\~ I Q,O i ~ j~~ ~i-~','+ \~,\, \ ~\ ~ 1 ~y ~ ~~~ ~, v ~` '" ~~ --- -- 3p Qq~' O 8 ~ ~-- . It ~ tt _ _ _ \ ~ - `- ~~7 0 4~2 • S ~\ ~~ ~~ ~ 1~ ~ \~~ •~ ~ ~ ~~:~~ _, q6` \ \\ ~~ ~ ~ ~~ 1 ,, 1~ ~` ~` \ , ~ ~~\ ~, F~4 ,, . - ~STREE~- 93B ,\ . ~~. 3.3.4 Analysis of Significance 3.4 3.5 Standard development regulations will insure that no significant e~hviron- mental impact will result from the proposed land form change. Drainage Patterns 3.4.1 Project Setting The subject property is located within the Long Canyon drainage basin (Sub basin A-7.0) and the Rice Canyon Drainage basin (Sub basin A-~.3).(Fig. 4) In accordance with the "Fogg" report the current and eventual (developed) 50 year runoff is as follows: Current (cfs) 50 year Frequency (cfs) Long Canyon (A-7.0) 158 Rice Canyon (A-1.3) 312 3.4.2 Impact and Analysis Because of the site topography and soil types that water (expansive) there will be little increase in to development. No significant impact on drainage from project implementation. Archaeology 3.5.1 Archaeological Setting 158 312 retain quantities of runoff from the. site due patterns will reesult A detailed archaeological resource impact report is available as A pendix B to the EIR in the Planning Department. Anyone interested in thi~ technical support document should contact the Planning Department.; The findings of Appendix B are as follows: 1. Description. An archaeological survey of the subject; property was conducted between the hours of 7:30 a.m. and 112:00 p.m. on 17 September 1975. A total of 4.5 manhours was expended during that day by Russell L. Kaldenberg, Associate Envirolnmental Scientist/Archaeologist, representing RECON. The archaeologist traversed the area in a general north-south direction, beginning at Otay Lakes Rd. on the east. The complete acreage was I successfully traversed with the exception of the central pjortion of the subject property which has been used for the placemlent of fill material. 2. Results of the Archaeological Survey. Definitionally~, an archaeological site is a place where some sort of human activity has occurred and some physical evidence of that activity remains and can be identified. In the scientific sense of the worlds, no archaeological sites were located during the archaeological survey. However, one area with a concentration of prehistoric artifacts :+ i / ~ ~ \~\ 'r j `~ i / ~ ~~ '•, ~ ~ I...- ~ ~ /` ~ ~ ~ -, '~ ~ ~ -red 1 \ `, ~ /.,,r• ~ I r- l ;• `• ~ w -- .. ; :; ~ ~~ ~~ ..ANC ~--- ~ \,~ `~I ~, \r-'~V ~.., q - .~ J ,. '„ ~~ '~~"' h ~' ~ -~:r _ I - ~ ~/~ ~, I -k~w y • r X ~ ~ ~ ~ _ ~ t, ~ ~~~ __~ a-n . 1 _~ ,M11~.~ a ~'~' tll /.~-.c r Il~r~l.~ r ~\J '4;[< 'l A:r..`~ti'ti \..1 ~., t• A~ .1 ~ .. h 1 ~ f 1 .., .. , r , ' h~-+v..r~ .,,~ was identified. Due to the placement of soil in this area of the subject property, it is impossible to determine if a site underlies the fill dirt. Two artifacts were located in the mouth of a rodent hole at the edge of the fill area and thrree artifacts were located in the dirt road adjacent to the fill area. Due to these finds, it is felt that an archaeological site may be overlain by the soil. Without additional investiga ion, it will be impossible to determine the extent of and importance of the cultural resources, if any. The artifacts recorded and catalogued include: 4 flakes ! 1 core fra gment 1 projecti le point midsection Only one o f these is made from s tone found on the subject! property, the remaining artifacts were manu factured from stone present in the vicinity of Mount Miguel. Table A I Artifact Material From Bonita Vista Accession Maximum Maximum i Maxi um Number Artifact Material Len th Width Thic Hess BV-1 Flake Andesite 5.6 3.0 .~ gV-2 Flake Basalt 2.6 2.0 .~ BV-3 Flake Basalt 2.0 1.2 :~ BV-4 Flake Quartzite 5.3 2.0 BV-5 Core Fragment Quartz 4.5 3.1 2.~ BV-6 Projectile 4 2 Point Basalt 2.2 . •~ Artifact BV-6, the midsection projectile point, is interesting in that it has pressure flaked edges. The breaks at both the top and base appear to have occurred recently and may be the ~esult of having been driven over by a vehicle. 3.5.2 Potential Impact The archaeological resources located on the subject property may ~e the remains of an archaeological site which is situated under the fill area. If a site is located under the fill, it is probable that it represents the late prehistoric phase of local prehistory (Kumeyaay). This is proposed due to the style of projectile point implicated by its remaining midsection. No other diagnostic artifacts were found on the subject property. Without additional investigation, it is not possible too infer further cultural or temporal affiliations of the artifacts. It is also possible that the artifacts have been secondarily deposited on the site as a result of the placement of fill dirt on the subject property. 11 Although al] archaeological resources are considered to be non-renewable resources which any development may adversely effect, some archaeological resources, because of their very nature, are subject to more adver~e effects than others. Also, due to the nature of archaeological resources, some sites are considered to be more significant than other sites. In an attempt to establish objective criteria for the assessment of archaeological sites, the project's consulting archaeologist presented a professional paper to the Society for California Archaeological ~nnual Meeting in March of 1975 (Kaldenberg 1975) which outlined standards for assessing significance. Based upon that criteria, Appendix B of this report has been prepared. Due to the presence of artifacts near the fill dirt area and near ~he mouth of a rodent burrow, and because of the large amount of fill laced in that area of the property, it is not possible to scientifically frank the site. Therefore, recommnedations for the mitigation and additilonal assessment of the archaeological resources are made in the appropr fate section of this archaeological impact report. The proposed Bonita Vista project will directly affect the existing archaeological resources located within the proposed project area. Any grading, cut and fill, or house padding operations will destroy the archaeological resources which may be underlying the fill dirt area. 3.5.3 Mitigation i Since the current plot plan and grading plans will directly affect ny underlying archaeological site, the following mitig,~i:ion measures a e proposed as a method of obtaining information about this non-r~ne~•~a le resource: 1. An archaeologist should be present during the grading j operations in the vicinity of the encountered archaeological resources. ~ 2. If archaeological material is present, a systematic pothole series should be conducted to verify the vertical and horizontal distribution of the site material. In conjunction with the posthole series, the following items are recommended: a. mapping of the systematic posthole series b. surface collecting and cataloguing all recovered artifacts (a surface map of the few artifacts is dot recommended due to the paucity of artifacts and heir disruption by agricultural action) '~ c. photodocumentation of the archaeological work- j d. preparation of a report for the public record. 3. If the posthole series indicates that the subject arc aeological resource is limited to surface material and contains no subsurface or highly disrupted subsurface material, then no further archaeo- logical work would be recommended. If the site is proven to contain concentrated archaeological deposits, then a five-percent subsurface excavation may be recorrm~ended. The need for additional subsurface excavation will be borne out in the results of the five- percent excavation. 12 4. The archaeological site should be institutionally recgrded with the San Diego Museum of Man and the San Diego State University Department of Anthropology. 5. All recovered ~tifacts should be treated with dignity and should be housed in ,:{n appropriate institution. In the event the artifacts are limited in quantity, an appropriate instituti1on may be construed as a display area within the proposed develop~ent. 3.5.4 Analysis of Significance The implementation of the mitigation measures herein proposed and agreed to by the project proponent will preclude any significant impa~t on the environment. If any archaeological resource is present it could be treated in an appropriate manner insofar as its relative importance. Because an archaeologist will be present during all grading operatilons minor finds will be analyzed and recorded~if any major findings ale encountered they will be subjected to further field studies. 3.6 Biology 3.6.1 Project Settin The Rice Canyon area includes approximately 2,400 acres of relati ely undisturbed natural vegetation. This area is located generally ea ,t of Interstate 805, south of Bonita, west of Otay Lakes Rd., and north~of Telegraph Canyon Rd. The area is dominated by Coastal Sage Scrub communities and sti11 supports some of the original :vildlife population; the larger mammals having been generally extirpated. The subject property lies at the extreme eastern edge of this area and biologically can be included as a part of it. Much of the field work utilized to prepare this report was accomplished in areas immediately adjacent to the subject property and within Rice Canyon. Because of the relative homogeneity of the Rice Canyon areas, information obtained in them can be reasonably extrapolated to the project site; with certain restrictions due torecent disturbance of the subject property. Two vegetation types occur on the subject property: 1. Modified Coastal Sage Scrub, and 2. heavily disturbed annual/perennial vegetation. The former consists of 90 percent Coastal Sagebrush (Artemisia californica} with a scattering of other shrubs including Flat-top Buckwheat Erio onum fasiculatum), Toyon (Heteromeles arbutifolia), and Bladderpod (Iso eris arborea The latter community consists of various introduced and ative, annual and perennial species, including such things as Russian Thistle (Salsola iberica), Horehound (Marrubium vulgare), London Rocket (Sisymbrium irio Tree Tobacco (Nicotiana lauca and others. , The subject property is still fenced (three strand barbed wire) along much of its periphery. This, along with the homogeneous nature of the 13 native shrub community (other, nearby stands have a much lower percentage of Coastal Sage Scrub and a higher species diversity), indicates thpt the area has undergone a recent major disturbance. It is quite possitrle that cattle have been run on the property for a period of time. The effect of this disturbance has been to reduce species diversity and to place the site into what amounts to a secondary succession. This succesjsional process will eventually result in a more mature, stable, diverse community if allowed to operate undisturbed for a sufficient period of time., Successional processes operating on the heavily disturbed areas, reas currently grown to annuals and perennials, will require a much to ger time period to reach a climax. That succession will be allowed t work undisturbed on the area is unlikely due to the current level of h~man use. Fire, dumping, and off-road vehicles are current impacts the comm nities must deal with. Given the range descriptions in Munz (1974) and Higgins (1949), t'ere may be a total of twelve significant plant species (as defined by the California Native Plant Society, 1974) occuring on the subject pr perty. These are: *Adolphia californica *Haplopappus junceus Ambrosia pulila Hemizonia conjugens Atragalus deanei Muilla clevelandii Brodiaea orcuttii Ophioglossum californicum ~ *Dudleya variegata *Opuntia parryii var. serpe~tina Ferocactus viridescens Selaginella cineiascens Of these twelve species, fiv? (those marked with asterisks) are shrubs or have above-ground perennial parts. These species could be easily found during a ground survey if they were present. Only one of these was encountered; Hidden Bisnaga (Ferocactus viridencens) was found one moderate slopes in the southwest corner of the property. The remaining s~ven species are annuals or below-ground perennials and their presence or abs nce from the project site could not be accurately assessed due to the sea~on (late summer) of the survey. Existing Wildlife Because of the modified nature of the vegetation of the site, and because of the influence of man's activities, wildlife diversity on the ubject property is severely reduced compared to surrounding, less distu bed areas. Species utilizing the site will be the same as those on ether nearby areas, but the intensity of use will be much less. A detailed listing of the vertebrate species known to occur on t e subject property or which occur on property immediately adjacent to it a d are expected to be found on the subject property at some time, is pr sented in A endix C of this report. A detailed discussion of this wi~dlife will PP not be attempted in that the lists stand by themselves. Certa~n~species should, however, be pointed out. Three of the reptilian species are: Orange-throated Whiptail Coast Horned Lizard, and Common Kingsnake. 14 These have been identified by the California Fish and Game Commisspon as having critical population levels and possession and bags limits have been established. No mammal species found or potentially found on!the site have been given special designation due to their population status. One bird species known from immediately adjacent to the site, the ~3urrowing Owl, and two others which may utilize the site, Cooper's Hawk and Red-shouldered Hawk ~ have populations which are declining. These species are designated as Blue List species (Arbib, 1973). 3.6.2 Impacts and Mitigation Measures A. Impact of the Proposed Action Implementation of the proposed project will have several ei on the existing biological systems. These effects or impaq be summarized as follows: 1. Grading of the site will result in the loss of aq mately seven acres of native vegetation. ', 2. Loss of this vegetation constitutes a loss of wi' habitat. Cover, food, nesting, and homesites for boti vertebrate and invertebrate species will be lost. 'fects :ts may ~proxi- dlife 3. Grading may result in the destructio^ of a fevr i;hdividual animals. Fossorial species flee underground when dis~urbed and may be destroyed by earth-moving equipment. i 4. 6ildlife species displaced from the subject prop rty will flee into peripheral areas. Such areas will often be at or near carrying capacity already and this may resultlin a high mortality rate among immigrants or residents or both. 5. Children and domestic animals may be introduced jnto the immediate area. Such new residents may adversely effect adjacent, still wild, areas. 6. The project is growth-inducing and as such will have a long term effect on the entire Rice Canyon area. Tha~ this area will be completely developed in the near future ~s highly probable. Such development would result in the loss of a considerable amount of vegetation and wildlife habi~at. 7. A few individuals of Hidden Bisnaga (Ferocactus ~iridescens) may be destroyed. This species is rare and endangered in this country, although it is common in Baja California. 15 B. Mitigation Pleasures to Reduce Impacts The intent of this section is two-fold: certain mitigation measures to reduce the effect of probable impacts will be outlined and certain facts will be summarized so as to put the afore- mentioned impacts into their proper perspective. 1. The existing vegetation on the site is composed primarily of extemely common species. In a botanical sense, then, loss of these individuals is relatively insignificant. 2. A few individuals of Hidden Bisnaga may be lost'.. during grading. The majority of the individuals present, however, are located in the extreme soutP~western corner of the property. This area is to be left as open space and will not be disturbed should the project be implemented. 3. Landscaping planned as part of the project will mitigate to a certain extent the loss of native vegatation. 4. The existing Coastal Sage Scrub community is one of low diversity which is undergoing succession back to a more mature association. As such, it does not have the significance a mature, integrated community would have and therefore its loss is not as significant. 5. Since the plant community is of low diversity it should be anticipated that the animal community using it is also of low diversity. Loss of this area will not, then, be as significant as loss of some neighborhing areas might be. 6. Landscaping planned as a part of this project will provide habitat, food, and cover for some wildlife species. These species will in many cases be different, however, from those already inhabiting the site. 3.6.3 Analysis of Significance The proposed project is located at the head of Rice Canyon in eastern Chula Vista. The site presently is occupied by a low-diversity plant community which, it is anticipated, has a low-diversity animal community associated with it. Implementation of the proposed project will result in a loss of native vegetation and of wildlife habitat. This, however, is in itself insignificant because of the nature of the extant communities. In a long-range sense, though, the project constitutes one more incursion into the Rice Canyon area. The ultimate loss of vegetation and wildlife throughout this area is significant biologically. 16 3.7 Air Quality 3.7.1 Existing Air Qualit The San Diego region is very susceptible to weather conditions whijch cause pollutants to be trapped to the ground and to build in concentration. These climatic conditions include; (1) low mixing height, (2) low Wind speed, (3) little or no rain and, (4) abundant sunshine. George C. Holzworth in the EPA publication (AP-101) "Mixing heights, wind sp'eds, and potential for urban air pollution throughout the contiguous United States" states: "By far the greatest number of episode days is 56 (over 5 years) which occured at San Diego, Calif...at nearby Los Ajngeles, episode days are less than half those at San Diego." The Chula Vista planning area is witf~in the San Diego air basin. !The San Diego basin in 1972 exceeded the ambient air quality health standards for oxidant, particulates and carbon monoxide. The 1972 violation; of the carbon monoxide standard occurred on 2% of the days during the firjst quarter of 1972 and no violation has occurred since. Violations of the particulate health standard and the oxidant stanldard have continued until the current date. Table B shows the trend in the number of days in which the federal oxidant standard was exceeded jduring any one hour average. Table C sho~vs a plot of the annual averagei of maximum hourly averages, both of these tables show a general improlvement in oxidant levels since 1968 for the total air basin and since 197;2 for the Chula Vista area. The San Oiego air basin is strongly influenced by activities southi of the international border insofar as particulate pollution is concerned. The high particulate levels in the extreme southern portion of thej air basin are thought to be a result of uncontrolled particulate sourcies south of the border such as open burning. The only station which consistantly exceeds federal particulate standards is the San Ysidlro station. The Chula Vista station has not recorded a violation of the federal particulate standard since it began operation in this capacity in the 3rd quarter of 1974. The air quality regulations of the EPA require that the annual er~ission of reactive hydrocarbons (the main constituent of oxidant) be reduced to 25% of the 1972 level to meet the oxidant standard by 1977. If thus standard is to be met there will have to be major changes in the llife styles of people in the region. For example, EPA expects that a 4~5% reduction in automobile vehicle miles travelled in the region will be necessary during the next 3 years in addition to vapor recovery ar~d other fixed source emisson controls. 3.7.2 Project Impact 1 i The land uses in the project will generate 3035 daily vehicle trip These vehicles will generate air pollutants at the levels shown in Tabl e D. 17 w f ~ i w a i _ ~ ~ o i = w N o "'~ N a.. ~ ®w 4. v a~ ~ ~ ma _a ® n O~ ~ ~ O +- .+.~ ~ ' Q O { 0 L ,~ iY K Q ~ ~.. ~ Q H ~ ~ ~ ~ ~ H ~ C ~ ~ ~ w U °w Ml ~ W Z O>( w Q m N r m L"= l Q I (7 Z W ~ O Q J 2 U ~ N W U I ~ 1 ( 1 ~ I I I I I 18 0 0 0 0 u o 0 0 _ n n O n w TAQLE C . ~ .U{ N ~ ~ ~ ~ ~ A d k r.{ ~ i-~ ~ U x ~i _ ~ ~... ~ ~ CL ~~{ ~ G1 ~5~ p{ X ~ Q ~ ~ o ~ a~ .,~, ~ y ~ Q Q_ c-1 d E v ~ in x ~ rv ~ ~ ~ ~ ~ ~' ~+ E~i t1r q DIl tli 111 1q D i~t C6 AI W Rt1ulIRL RYE4AGE - PPN 19 it I i ~ ~ ~° o°'nd~~ ~ U ~ o O ~ a :_] O U G-a U lA _. I ~ t~: Q i I ~. ifl G i I i ® W [R Lfl t!i !~ W fli 1 TABLE D A. EST II-tATEO ItiCREt~iENTAL It~CREASE Its Et•1ISSIOttS MOBILE SOUt;CES Emissionl Trips or Factor Usage hate 2 Vehicles tlumber of ' l ~ T t Total Pollutant gm/mi per Vehicle Miles/Uay per Land Use Acres or Land Uses a o Tons/Dayi Tons/yr, Carbon 4.0 750 trips/AC 2.21AC Comm. 0.809 % 295.32 f ionox•i de 50 8,0 300 2.18 Med. 6.0. 8 /DU 90 apts. 4.0 I • Hydrocarbons 6.5 8.0 ~ •same same 0.150 38.39 6.0 Ptitrogen ~ 4.0 C>:i dca 8.0 (t~Ox as N02) 5_ 6.0 same ~ same 0.081 ~ 29.53 Particulates 0.58 8.0 same. same 0.009 ' 3.29 Oxides of 4.0 same same 0.003 '! 1.10 Sulfur 0.20 8.0 ~~ ~ 1 IEPA April 1973, Pub. No. Ap-42, p. 3.1.1-6 2Considering the average mileage of 12.5 m~les/gal (EPA-1972, p. 2-3), ~. the gallons of gasoline consumed, 500 x 10 gal/year, for an automobile ~ population of 750,000 (ARG-1972, p. VII-t3). A usage rate of ?_3 miles can be .de rived.. In the San Uiego region, an average one a~ay home to work trip is 9 miles and most other one clay trips average about 6 miles in length. i 20 In addition the increased demand for electrical energy will result in an increase in emissions from power generating plants. The incremental increase would be as shown in Table E Combining the pollutant ~ata from mobile and stationary sources and comparing the total to the amount of air pollutants in the air basin, provides an analysis of the s7gnificance of the projects impact. Table F provides this data. It is the conclusion of this analysis that the project would not rave any possible significant impact on air quality. 3.8 Noise 3.8.1 Ambient Noise Levels i The primary sources of noise in the project setting is automobileiand truck noise. based on the HUD Noise Assessment Guidelines, the first 78 feet adjacent to Otay Lakes Rd. would be subject to normally unacceptable noise levels. This means that the ambient noise level would be offer 65 dBA for more than 4 hours each day. Truck noise would produce similajr noise levels for about 53 feet. i In the future setting of the proposed project, traffic volumes will increase to about 16,000 on Otay Lakes Rd. There will be a traffic signal at Otay Lakes Rd. and East "H" Street and there may be a signal aft the intersection of the proposed collector road in this project and Otay Lakes Road. These traffic control devises have the effect of lowering automobile noise and increasing truck noise. Normally unacceptable noise from auto traffic will extend only about 25 feet into the site, while truck; noise will be at a cloarly unacceptable level over the first 120 feet, end normally unacceptable over the entire site. These noise projections do not consider any barrier ajustments. 3.8.2 Mitigation The commercial structures will have some shielding function for the residential project element and residential buildings will offer some acoustical protection for open space areas. Acoustical insulation techniques can be utilized to protect interior spaces. Insulation requirements for energy saving will be adequate to produce a 20 dBA loss through unit walls. This will result in a interior noise level df 45 dBA when the exterior noise is 65 dBA. 3.8.3 Analysis of Significance Because of the land use design, structure siting and insulation equirements, all areas within the residential element of the project will hav a suitable acoustical environment. The commercial areas adjacent to Otay L kes Rd. will have a clearly unacceptable noise level for residential used and would require extensive barrier installation to produce an acceptable ambient noise level. 21 ~' , E. ES7It1ATE0 ItJCREh1ENTAL IJlCREASE IN Eh1ISSIONS S7ATIOtlARY SOURCES 1 Emission Usage Rate Number of ~ - . 7ons/YR. Source Pollutant Factor kg /106 m'3 Per Land Use Acres or Land Uses Natural gas Particulates 160 ~ 0.070 combustion Space heating Oxides of Sulfur g.6 - - ~ i 0.004 Cooking l•Jater Carbon ~ - heating P~onoxide 320 - 0.139 - Hydrocarbons 128 ~ 0.056 Oxides or Nitrogen 1280 1920 - residentia commercial - 0.575 lEnvironmental Protection Agency,~'.'Compilation of Air Pollutant Emission AP-~2 (revised April, 1973) p. 1.4-2 actors," 22 ~ • • •~ • • I ~ • 1 ' 1 1 • ~ 1 • • '" . • ~ • ~. ' ~ ~ i •1 + ~~ j Y ~ ~] L ~, .r_ .r- . ~~ L b ~, Ql C O L O o>'~ j V 'V V +-~ C: r G I .--. N O V r ey C i- ' Ri ~ ~ rt7 Q3 M M ~ ^ ~~ v~ to ~ M M c}' OO MI v 7 0 M CO d' M r N E_ Y O r O . O L .-- G •.- r V O O N G ~ •r- t6 HCJ i~CO N G ~ •r.. I ~ N ~ • L ~ . U CO r i C ~ ~-+ O L C r- ~ 4 U ~ r r n ~ !~ •N > O U -•rna c • O O O O . r + ~ u - v ~r O O O O O ~ N ~ O V ~ r ~ ~ ~,y c. rJ H N V7 t N I ~:.~ %, rt Ci' N lD N O ~T rt +~ ~ t!') N U~ M 4ahh W ~ N N ~ ~ O O O W ~ O C • O O O O O ~-}- w r-i N J W U ~ r- p1 M O r p O CO O O W p Q o b r O O O w .l ~-- O O O O i U C ~ ~ I W M r ~ O r O O i~ p O O O O fl_ ~ p O O O O f. s.. vl O O O O O N W J F¢-• O F- LL a 0 Y .r - r n N LL•) LP •f- :~ ~~ { .- ~ M ~ ~ l0 ~ y .n O • ~ N tf) N r i. • O rt3 ~ r r i~ N •~- ~3 _ /~ .c' O O 10 U V ~-+ li] I ~.r.. I C/ VI ~ Ol O G]O r N r ~ M G L '~ N r N r N r N ~L C U H' N a ~ , .~ f° w ~~ i N o L C r O C dl F V1 •r V ' " dl ~ Ip t1 V Y7 V1 S7 V N L N " r J] O N U C) J) O L r N Y O rJ O L_.- C: J O •..~ ti rJ V G G 2 pN F- Cy U._ ..23 1 I i i ~I i i1 3.9 Schools 3.9.1 Current Facilities The project site is currently served by the following schools, wi~h indicated capacities and attendance: Capacity 3.10 Tiffany 684 Bonita Vista Jr. High 1190 Bonita Vista Sr. High 1485 Attendance Availably Space 549 135 1513 (-323) 1546 (- 61) 3.9.2 Impact The project will, based on genet°ation factors adopted by City Cou~cil policy, result in the following increase in school children: Elementary 45 students Jr. High 27 " Sr. High 18 " 3.9.3 Mitigation It is the policies of the school districts to require the payment~of contributions for assistance in providing educational facilties. This contribution will amount to $300 for each pupil residing in ~he development. 3.9.4 Analysis of Significance The project will add students to currently over crowded schools, the developers contribution will assist the school districts physical; facilities on a short term basis. Tax income from the project w~ll be of benefit on a long term basis to insure adequate operation o educational facilties. The project could stimulate the expansionof existing schools or the building of additional rooms due to the over crowded secondary facilities. Parks & Recreation 3.10.1 Existing Facilities The project is located within Park Service District No. 11.00. T~ere is currently no population or parks located within this district ands projections based on the current General Plan show a population o~ 7,700 people and 30.8 acres of parks within the district. 3.10.2 Impact The project will require .095 acres of park land to adequately serve the projects population. This service district has not been subdivided into sub-districts because no land use plan has been developed to more specifically identify the location of park sites. The installation of park facilities at this time would be premature. 24 f ~ 3.10.3 Mitigation The project plan includes private improved open spaces, swimming fool and recreational buildings. I The developer wi116e required to pay in-lieu park fees in accordance with the following schedule: 1 bedroom $140 2 bedrooms 150 3 bedrooms 160 3.10.4 Analysis of Significance The project will have an insignificant impact on recreational fac in the project area and the park fees will insure that public par facilities will be developed in order to serve this project at an time. 3.11 Police & Fire Protection 3.11.1 Existing Facilities Police protection is provided primarily through mobile units on throughout the community. The current ratio of police officers population is 1.1 officers per 1000 people. Fire protection is provided by Fire Station # 4 which is only from the proposed site. lties ppropriate is the mile. 3.11.2 Project Impact The project will require a greater density of police patrol in a emote area of the community. Fire protection can be easily accommodated by existing facilities; and those installed as part of the project. There will be no significant impact due to fire protection requirements. 3.11.3 Mitigation 3.12 No mitigation of increased police requirements is proposed. 3.11.4 Analysis of Significance The increase in police beat length along the 630 feet + of new street to serve this project will not have a significant impact on the ability of the police department to provide police protection for the project site. Transportation/Access 3.12.1 Project Setting The project site is primarily provided transportation via surface automobile links to the regional vehicular transportation system. Direct 25 links to~the project uses are provided via the proposed residential collector road to and via Otay Lakes Rd. The most critical portion of this direct link is along Otay Lakes ~Rd. as it nears Bonita Rd. to the north. Current traffic volumes in that area are in excess of 9,000 ADT and a projected volume of 26,000 in 19190. The current improvements are adequate for 25,000 ADT. Right-of-Wady exists to provide improvements to an adequate level of service. City Bus Route g provides lines from the project site to Bonita anjd the central Chula Vista area. 3.12.2 Project Impact i The project will generate traffic volumes as follows on a per day (basis: DU/AC Factor Trips Apartment 90 DU x 8 per DU 720 Medical Bldg. 2.18 AC x 300 per AC 654 Retail Commercial 2.21 AC x 750 per AC 1658 3032 Average Daily Teri ps The added traffic volumes can therefore be adequately accommodatedl,by the existing improvements. As subregional growth occurs there will beta need for additions to the service capacities of Otay Lakes Rd. In view; of the projected volumes, traffic signals will not be warranted at any intersections in this project. However, as development occurs to the west, a si nal may very well be warranted. Access to the retail commercial portion of the property is locatedialong Otay Lakes Rd. These two ingress points are designed so that adjo Wing parking spaces have back-up space that would block traffic enterin the site from Otay Lakes Rd. This circulation design will create a se ious safety and design problem. The most easterly entrance to the medial professional building would create serious conflicts between vehicles entering and leaving the premises. I 3.12.3 Mitigation j The parking spaces which create the circulation conflict could be eleted or redesigned to eliminate this conflict. The entrance to the medical building could be redesigned to eliminate the conflict with entering the exiting traffic. 3.12.4 Analysis of Significance The parking layout would adversely affect traffic safety if the above noted design changes are not incorporated into the final precise plans. I; 3.13 Utilities/Energy 3.13.1 Project Setting All necessary utility facilities; water, sewer, gas, electricity are available in Otay Lakes Rd. The capacity of these facilities are adequate to accommodate the proposed project. 26 3.13.2 Potential Impacts The consumption of natural resources and generation of waste materials will be in approximate accord with the following: i Apts Medical Commercial Electricity 344,610 Kwh/yr 14,207 Kwh/y r. 11,200 Kwh/yr Natural Gas 89,030 Therms/yr 13,197 Therms/yr 10,400 Therms/y r! Water 23,400 gpd 7,029 gpd 5,000 gpd Sewage 18,720 gpd 5,000 gpd 4,000 gpd Trash 900 lbs/day 400 lbs/day 350 lbs/day The somewhat remote location of the facility will produce longer jregional and sub-regional automobile trips to and from the residential portion of the project. The commercial elements of the project will tend tojreduce the number of trips and trip lengths to neighborhood and communit~ scale commercial centers for the residents of the project and the gener 1 area. The medical building will have a similar impact as the commercial use. The number of trips to the central Chula Vista area or other regional medical centers will be somewhat reduced from this entire area. 3.13.3 Miti ag tion The use of multi-family dwellings in basically more energy efficient than single family dwellings. This factor plus new insulation and oth r requirements of the building code will insure that there will not~be any inefficient or unnecessary consumption of energy due to the heating of the structures in the project. Another major source of energy consumption is the heating of watelr. The proposed project could reduce the energy requirements for water hjeating through the use of solar water heaters. Advances in the "state oif the art" have resulted in very practical devises for water heating in commercial uses which demand large quantities of hot water, domestic use andl swimming pools. ~ The use of fluorescent lighting, reduced architectural or display lighting and the avoidance of over illumination could be implemented to prlevent unnecessary electrical consumption. I 3.13.4 Analysis of Significance The project will not result in the unnecessary and inefficient consumption of energy. Energy consumption could, however, be reduced to a lower level. 4.0 Unavoidable Adverse Environmental Impacts 4.1 The site contians expansive soils but they can be adequately treated through grading techniques. 4.2 Potentially significant archaeological sites could be altered or even destroyed during grading of the site, however an archaeologist will be present during the site grading which will minimize potential irlpacts. 27 r , 4.3 The project may result in the loss of a few examples of a rare and endangered species of plant and will result in an increased population near a stand of the species. 4.4 The project will generate students in an area of over crowded schools. 4.5 The project will generate some 3000 daily vehicular trips. 4.6 The commercial area will be subject to clearly unacceptable noise levels as traffic volumes increase to 26,000 ADT on Otay Lakes Rd. The residej~tial portion will be normally unacceptable but considering the barriers resu~ting from the commercial and residential structures, noise will be at an acceptable level within the project. 4.7 The project will make an insignificant alteration of land form. 4.8 There will be a reduction of natural and other open space by almost 9 acres. 4.9 There will be a short term increase in noise and dust during construction activities, and a long term insignificant inacrease in the ambient noisy level due to urbanization. 4.10 There will be an incremental increase in air pollution. 4.11 There will be a minimal increase in the demand for public service, other than secondary education. ', 4.12 T"ere will be ar increase in resource consumption due to the construction and operation of this facility. A significant reduction in energy consumption could be achieved through measures discussed in this EIR. 5.0 Alternatives 5.1 No Project Implementation of the no project option would preclude the placement ofthe project in the area of a rare and endangered plant species and of a potentially significant archaeological site. This option would require public purchase of the project site. 5.2 Lower Density Residential Development Development of the site at a lower density residential use would resultlin fewer secondary students. This type of development would not however, ~e in conformance with the General Plan or the zoning of the site. 5.3 Larger Commercial Development i i If a larger portion of the project site were denoted to commercial uses; the impact on the secondary school system could be reduced. However, with the 10+ acre commercial site just to the south having been graded and a 6 acre neighborhood 28 a commercial site about 1/2 mileto the south, there doesn't appear to be any substantial demand for more commercial land uses in the area of the proposed project. 6.0 Relationship between Local Short-Term Use of the Environment and the Mafintenance and Enhancement of Lonq-Term Productivit,~. The project will result in a long term increase in population adjacent ~o an area containing rare and endangered species of plant life with indirect!impacts due to more frequent use of the natural landscape by man. If there is significant archaeological site underlying the fill material on the property, excavation accidents could result in the destruction of a non-renewableiresource. The range of the environment will therefore be curtailed on a long term; basis. 7.0 Irreversable Environmental changes that will result from the Proposed Project The proposed project will result in the consumption of materials, energ,~ and labor for implementation and operation. Some of these resources are nosh-renewable The development will commit the site to the proposed use on a long term!basis with the commitment of future generations to the use and concomitant cod~tinued resource consumption. The growth inducing pressures of the proposed road could result in secondary impacts that will make similar commitments for future generations. 8.0 Growth Inducing Impacts The installation of public facilities which are part of the proposed project, the establishment of new land uses in a developing area and the increased pressure on the urban infrastructure, all indicate that the project wild have growth inducing pressures. This characteristic will promote faster dev lopment in an area with unique biological characteristics and will result in th~ loss of a considerable amount of vegetation and wildlife habitat. 29 ,', t 9.0 Organizations and Persons Consulted Chula Vista Planning Dept. i Douglas D. Reid, Environmental Review Coordinator Larry Yamagata, Associate Planner Ken Lee, Current Planning Supervisor Lu Quinney, Associate Planner Chula Vista Department of Public Works Bill Harshman, Senior Civil Engineer Olu Sawyerr, Traffic Engineer Roger Daoust, Associate Civil Engineer Roberto Saucedo, Junior Civil Engineer Bonita Glen Development Inc. ~ Julie Prewitt, Assistant Vice President Lloyd Hill, Executive Vice President & General Manager RECON Royce B. Reggan, Assistant Environmental Scientist/Biologist Russell L. Kaldenberg, Assoc. Environmental Scientist/Archaeologist William S. Krooskos & Associates William S. Krooskos, President Alfred N. Venton Sweetwater Union High School District Phil Jolliff Chula Vista Elementary School District John Linn 30 " ~, t• 10. 0 Input ~~ ~ ,•, TO: Planning Commission FROM: Environmental Control Commission SUBJECT: EIR-75-5 Bonita Vista The Environmental Control Commission has grave reservation$ re- garding the construction of this project. As pointed out in the draft EIR, the schools in this area ~re already over burdened. The 5300.00 contribution for each addi- tional student entering the subject schools does not m.itig~te the effect of overcrowc?ing on the quality of education received. This project is a major growth inducer and cannot but accelerate the spread of urban sprawl. The piece meal planninc in this area can only crate a hodge-podge of unsightly structures 'where once there was open space. Protection of our remaining opdn space, and particularly the insidious gobbling up of the Rice Canyon area, is of utmost importance. Due to the fact that this project will directly affect archjeo- logical resources located within the proposed constructionjarea, the Commission strongly recommends that if the project is approved, the mitigation measures (3.5.3) as outlined in the draft EIR be strictly enforced and adhered to. It is recommended that due to the condition of the soils in the project area, that the mitigation measures (3.2.3) be adhered to. R L ctfully submitted, i ~~'~ Patricia F. Keith, Chairx Environmental Control Comr~.ission i .1 ~'-'C~ i ~ k , 31 December 2, 1975 w p ~~ ,~ ...ate.. TO: Honorable Mayor and Members of the City Council C~/ VIA: Lane Cole, City Manager FROM: D. J. Peterson, Director of Planning SUBJECT: EIR-75-5 on a 10 acre project consisting of a 90 unit apartment project, a 20,000 square foot medical o~fice and 16,000 square feet of retail commercial floor ~rea on the west side of Otay Lakes Road, 1000 feet north of East "H" Street. This EIR (copy enclosed) has now been adopted by the Punning Commission as the final environmental document on the proposed project. The Council will be asked in the near future to ce tify that the final EIR was prepared in accordance with CEQA and hat the Council has considered the document in arriving at their] decision on the project. The document is supplied to Council at this time so that Council may review it prior to consideratipn of the project itself. ~' The project could have significant impacts due to soillconditions, archaeological resources and the natural vegetation habitat which includes rare and endangered species. The applicant has pro~osed mitigation measures which will preclude direct significant i$npacts. The secondary school facilities in this area are curre'tly overcrowded and the project could exacerbate that existing p oblem. However, because of the nature of the project and assistance to be provided by the proponent, no substantial aggravation is anticipated. (See Section 3.9) i The project will have growth inducing impacts that will affect Rice Canyon which is a biologically significant resource. T~is is a potential secondary impact. ~1~i1./~~----~ D. J. eterson Director of Planning DJP:DDR:kf cc: G. Ashwill D. Norman J. Prewitt ,~.. ~• '