Loading...
HomeMy WebLinkAboutAgenda Statement 1975/10/28 Item 11..~ CITY OF CHULA VISTA COUNCIL AGENDA STATEMENT ITEM; N0. 11 FOR MEETING OF:10/28/75 ITEM TITLE: Resolution 7935 -Approving Change in Contract for Chula Vista Library SUBMITTED BY~ Director of Public Works/City Engineer ~ ] ITEM EXPLANATION The Director of Building and Housing supports an architect's recommendation that the following change orders be made to the library contract: Change Order # Description Price Change 13 Enlarge and fence in utility pad Add $ 5,870 15 Change interior walls from gypsum plaster to gypsum drywall Deduct (1,125) Total $ 4,745 The enlarged utility pad is required to accommodate the air conditioner chillers. The original design placed the chillers on the roof. In a re- evaluation of the design it was found that maintenance of the chillers would be much easier if placed on the utility pad located at the northwest corner of the library's lower level. It was also found that the chiller noise inside the library would be reduced considerably by locating the chiller on the utility pad rather than on the roof. The utility pad fence is required for protection from vandalism and for esthetic value. The fence will be .chain link with redwood strips inserted in the links. The strips, in conjunction with plant material, will hide the utilities from view. (continued on supplemental p.2 r'VI IICIiTC~ ATTAnI Ir f'1 GJIrIIDI I J HI I Hl~rICV Agreement Resolution X Ordinance Plat Other Environmental Document: Attached Submitted on STAFF RECOMMENDATION: Council approve change orders. BOARD/ COMMISSION RECOMMENDATION A P P R O V E D by the COUNCIL ACTION City Ce~ancil ei' C'_^.~a.la Vista, California Le,t e d, ,...,~~ ,',sub ~ ,;,,.f,••~.~.e.o.~IMI Form A- 113 (Rev 5 - 75) „,,~ t' Supplerlental Page 2 The wall change involves the substitution of drywall for gypsum plaster on some of the cement interior walls. The change improves the .interior design by making a better match with the other interior dry walls. The change also results in a savings of $1,125 in construction costs. In addition to proposed change orders 13 and 15, the following change orders have been approved for library construction thus far; C.O.# Purpose 1 Deletion of storm drain cleanouts 2 Tree removal 3 Removal & replacement of unsuitable soil 4 Additional demolition 5 Conduit change 6 Upgrade door frames 7 Additional sound board 8 Reroute waste lines 9 Relocate 3" cold water pipe 10 Eliminate fire proofing 11 Revise clocks 12 Revise floor finish schedule 14 Sliding doors modification Approved Amount By $ (1,010) Res. 7861 -0- DPW 989 " 2,713 Res. 7861 ( 800) DPW 185 " 408 " 479 " 382 " (2,050) Res. 7919 -0- DPW 460 " 32 8 " Net Change $ 2,084 Financial Statement Appropriated in Account #63-7003-5569 Original contract cost Prior change orders Proposed change orders 13 and 15 AK:fs $1,886,470 $1,758,300 2,084 4,745 $1,765,129 ~7G~s Form No. F-229 1~; 7 3 . CEt^nTIFICATE OF CITY/DI~CTCR CF I'IIJANCE Certification of *Jna~rotraciated Balance I HERrB~' C°FtTIFY that t'.ls mcnsy re~,uire3 fcr the appropriation of funds for the ~~uroose .set fnrth in the attached resolution is available ira *..ilo Treasur}', or is anticipated to come into tale Treasury, and is otherwise unappropriated. Amount S Purpose Bidder Fur.d Direc~c~ of Finance The City of ~:ciula "~Ii.st~ Date ?y Certi.fr_cation of ;Inancu^~.~-er~d Balance I FiEi?,F:°uY CERTIrY that the ince'rtec'~ness and obligation to be i:lc:~rrea by '~:_e contact or aree:r~en` authorized by the attached resolution can be incurrec. wi~hcut tho violatio:a of any Of the pr0~7iS: o:'i5 O the l~~la~t~r of file i:ifi~' Of Caiilla ~1iSt•1, Or thn ~"O.^.StitL•tlO:a ~Or t;:tt? iaNlu 7f t11e ;.~tat.:° G~ ~.; 1i=0i: i~, t118`. sufficient mor_ies have :peen ap_rro riated. for t're purpose ~~= said contract, that sufficient mo:lies to meet t're a:;lication:~ of the contract are actually in the Treasury, or a:-e anticipatac to come into the Treasury to the credit of -~~ce appropriation from wrich the same are to be drawn, and thGt said moriEs row actually'_n the Treasury, together with the monies a!ltici~ated to cane into the Treasury, to the credit of said ~~gg~•o~=r~.ation are otherwise unencw-nbered . Amount Not to Exceed $4,745.00 ,~ ~..", 63-7003-5569 Di~-ect~~r of k'i nanc T:1:: C.i#:y of Cnulu L'15t;c1 Date 10/23/75 "By Fund Library Construction Dept./Activity Public Works Purpose Change in Contract Chula Vista Library Bidder N/A ~y~5~ ~~