Loading...
HomeMy WebLinkAboutReso 1975-7786Form No. 31.2 Rev. 10-71 RESOLUTION NO. 7786 The City Council of the City of Chula Vista does hereby resolve as follows: RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA ACCEPTING BIDS AND AWARDING CONTRACT FOR ASPHALTIC CONCRETE FOR THE PERIOD JULY 1, 1975 THROUGH DECEMBER 31, 1975 WHEREAS, the following four bids were received and opened at 2:00 p.m. on the 30th day of Mav 1975 in the 0 ty of Chula Vis BIDDER UNIT PRICE V. R. Dennis Construction Co. $9.69 Griffith Company $9.65 Sim J. Harris Co. $8.90 Industrial Asphalt $9.00 ~uuu tons of asphaltic nt by City trucks: MAX. o OF TOTAL PRICE ESCALATION $11,093.11 8~ $10,996.18 7-1/2e $10,943.44 160 $10,494.00 100 WHEREAS, Sim J. Harris Company's bid of $8.90 per ton, plus escalation clause, is $.42 per ton higher, but it is more economical to pick up at the Sim J. Harris plant than at the Industrial Asphalt plant considering travel time and labor as shown in Exhibit No. 2, and WHEREAS, it has been recommended that said contract be awarded to Sim J. Harris Company who as assure t e City t at e is a license in the State of California and can produce an bond. e NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Chula Vista does hereby accept said four bids, and does hereby award the contract for said asphaltic concrete to Sim J. Harris Company to be completed in accordance with the specifications as approved by the Purchasing Agent of the City of Chula Vista. BE IT FURTHER RESOLVED that the Purchasing Agent of the City of Chula Vista be, and he is hereby authorized and directed to execute said contract for and on behalf of the City of Chula Vista. Presented by Approved as to form by ~ ~; ~ JEspinosa, urchasing Agent George D. Lindberg, City Attorn y ,~. ADOPTED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF CHULA VISTA, CALIFORNIA, this 17th day of June , 197 5 by the follawing vote, to-wit: AYES: Ccur;ciZmen Hyde, Scott, Hobel, Hamil NAYES: CauneiZmen ABSENT: Councslmen None Mayor of the City of Chuodla Vista r ATTEST ' ( ,~i ~ ~ ~ ~~ % Ci~~ Clerk STATE OF CALIFORNIA ) COUNTY OF SAN DIEGO ) ss. CITY OF CHULA VISTA ) ?, JENNIE M~ FULASZ, City Clerk of the City of Chula Vista, CaZifcrnZa, nC HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of that the same Yias not been amended or repealed. DATED rSEAL,I City CZer and CC-660 R77Pb BID N0. 2-1975-76 Date Opened May 30, 1975 - 1:0U P.M. Asphaltic Emulsion as may be required for the period July 1, 1975 through September 30, 1975, delivered to City Yard. CITY OF CHULA VISTA Purchasing Department TABULATION OF BIDS VENDOR: Chevron Asphalt Co ADDRESS: P.O.Box#12951 Oakland, Ca. 94604 PHONE N0:(415) 533-0341 BIDDER'S GUARANTY: VENDOR: Douglas Oil Company ADDRESS: P.O.Box #2500 Costa Mesa, Ca 926 PHONE N0:(714) 540-1111 BIDDER'S GUARANTY: Bid Bond Page ~ of ? Reqn. By P&S No. VENDOR: Edgington Oil Co. ADDRESS: 2400 EArtesia Longg Beach Ca9080= PHONE NO(213) 423-465 BIDDER'S GUARANTY:Bid Bond TOTAL PRIG 1 335 tons RS-2 Asphaltic Emulsion (appro ) 53.00 ~ 17,755.00 65.80 ~ 22,043.00 63.22 21,178.70 2hrs. free un loadin5~,excess >13.80/hr. Delivery Charge Maximum % of escalation COMMENTS 10.00 ~ 3,350.00 Prices not firm, maximum escalation n t stated- No Bid Bond - n t considered Firm Price OTAL BID 21,105.00 TOTAL BID 22,043.00 AX , TAX , ET TO 22,371.30 NET TOTAL 23,365.58 ERMS NET 30 TERMS NET 30 ,0.8. Fl cP ~„n~o~ C~, F.0.8. Destination ELIVERY DELIVERY 10% ~ 2,117.81 OTAL BID 23,296.57 AX -_ -- 1,397,J9 ET TOTAL __ _ _ 2.4,694._36 ERMS ~T 30 ,p,g, Destira_A_ion ~~ ELIVERY PR-117 BID N0. 2-1975-76 CITY OF CHULA VISTA Page ? of 2 Date Opened May 30, 1975 - 1:00 P.M. Purchasing Department Reqn. By P&S No. Asphaltic Emulsion as may be required for the period July 1, 1975 through September 30, 1975, delivered to City Yard. 1 335 tons RS-2 Asphaltic Emulsion ~approx ) Maximum % of escalation TABULATION OF BIDS VENDOR: Sim J. Harris Co. ADDRESS: P.O. Box #3069 S an Diego, Ca. 92103 PHONE N0:2 77-5481 BIDDER'S GUARANTY: Bid Bond 61.00 Firm Price VENDOR: Industrial Asphalt ADDRESS:P.O. Box #788 Lakeside, Ca. 92040 PHONE N0: BIDDER'S GUARANTY: 20,435.00 ~~ NO BID COMMENTS: OTAL BID 20,435.00 TOTAL BID AX 1 226..10 TAX NET TO 2 1,661.10 NET TOTAL TERMS NET TERMS _ F.0.8. Destination F.0.6. _ ELIVERY DELIVERY NO BID VENDOR: Union Oil Company ADDRESS:P.O. Box #7600 San Diego, Ca. 9213• PHONE N0: BIDDER'S GUARANTY: UNIT PRICE TOTAL PRICE NO BID ~ NO BID OTAL BID AX ET TOTAL ERMS .O.B. _ ELIVERY_ PR-117 Exhibit No. 2 Comparative Cost for Pickup of Asphaltic Concrete Distance- Travel VENDOR Plant Location Round Trip Time " Labor Industrial Asphalt 3 miles north 63.2 miles 2% hr. $15.70 of Lakeside Sim J. Harris Co. I-63 at I-15 off ramp 34 miles 1 hr. 6.27 Truck Cost Total $7.50 $23.20 3.00 9.27 Difference $13.93 Labor is based on Senior Maintenance Man at $6.27 per hour and truck cost at $3.00 per hour. Normal pick up is 6.5 tons. At the bid price, the material at Sim J. Harris is $2.73 per load higher but a savings of $13.93 by picking up at their plant. This is a saving of $11.20 per load.