Loading...
HomeMy WebLinkAboutAgenda Statement 1976/07/06 Item 1414 CITY OF CHULA VISTA ITEM NO. COUNCIL AGENDA STATEMENT FOR MEETING OF: 7-6-76 ITEM TITLE: Resolution #8245: Approving Change Order #44 to the Construction Contract for the Chula Vista Library SUBMITTED BY~ Director of Public Works/City Engineer /~//~ ITEM EXPLANATION: Change Order #44 is for three items of work required in the final stages of the library construction. The Director of Building and Housing and the Library Construction Representative approve this proposed Change Order. Total Change Order cost is $4,886. Item number one is for labor and materials required to install conduit runs and junction boxes for the cable T.V. antenna sys- tem. These facilities were not included in the original plans. Item number two is for labor and materials required to install gate valves in the landscape sprinkler system. The gate valves allow individual sections of the irrigation system to be shut off for repair without disabling the entire system. Item three is for labor and material for adding addi- tional electrical outlets in various locations in the library and for making changes to improve the illumination of the lighting system in the periodicals section. Continued on Supplemental Page 2 tJCY'11tS1 I J H I I Hl,l"IGU Agreement Resolution X Ordinance Plat Other Environmental Document: Attached Submitted on STAFF RECOMMENDATION: Approve Change Order #44. BOARD/COMMISSION RECOMMENDATION: COUNCIL ACTION r_ppR0VE8 by the City Council of „hula Vista, California mat e d......~.-.....G....':...~Sl..........._..._......._ Form A-113 (Rev 5-75) Supplemental Page 2 Agenda Item No. 14 The Following change orders have been approved thus far: C.O.# Purpose Amount Approved by 1 Deletion of storm drain cleanouts $ (1,010) Res. 7861 2 Tree removal -0- DPW 3 Removal & replacement of unsuitable soil 989 DPW 4 Additional demolition 7,713 Res. 7861 5 Conduit change (800) DPW 6 Upgrade door frames 185 DPW 7 Additional sound board 408 DPW 8 Reroute waste lines 479 DPW 9 Relocate 3" cold water pipe 382 DPW 10 Eliminate fire proofing (2,050) Res. 7919 11 Revise clocks -0- DPW 12 Revise floor finish schedule .460 DPW 13 Enlarge & fence in utility pad 5,870 Res. 7935 14 Sliding doors modification 328 DPW 15 Change interior walls from gypsum plaster to gypsum drywall (1,125) Res. 7935 16 Strainer in chilled water header 850 DPW 17 Colonnade plaster 5,267 Res. 7943 18 Tile anchors 557 DPW 19 Delete "T" type fixtures (567) DPW 20 Door latch sets 64 DPW 21 Extension services - room ceiling, lighting 2,692 Res. 7965 22 Steel angles for metal studs 885 DPW 23 Steel plates for roof 980 DPW 24 Steel roof hips 854 DPW 25 Steel angles for roof deck 972 DPW 26 Floor sink for condensate 806 DPW 27 Additional electrical service 1,673 Res. 7965 28 Drywall for basement stairs 265 DPW 29 Backflow prevention box 551 DPW 30 Condensate drains 2,664 Res. 7976 31 Delete concrete encasement for conduit (300) DPW 32 Ceiling in cable T.V. room 3,165 Res. 8017 33 Plastic splash panels 186 DPW 34 Curbs in parking lot 2,432 Res. 8017 35 Roof flashing 767 DPW 36 Grill flashing 428 DPW 37 Lighting fixture and return air grills 760 DPW 38 Regrading and curb relocation 4,965 Res. 8024 39 Counter Partitions 1,359 Res. 8042 40 Book slots, flag pole and ceiling (396) DPW 41 Support panels, motor deletion, duct work 506 DPW 42 Doors, microphone, thresholds gypsum board 735 DPW 43 Plaque 785 DPW $ 40,734 FINANCIAL STATEMENT Construction appropriation (contract cost plus 2~ contingency + additional funding authorized by Council Resolution No, 8017 $1,805,470 Original contract cost $1,758,300 Prior change orders 40,734 Proposed Change Order #44 4,886 $1,803,920